    兴仪启动发电
 
 

  公司自成立以来相继完成了二十余台火电机组的调试和性能试验任务,其中8台为600MW大型火电机组,范围涉及烟气脱硫,燃气轮机,燃煤机组和循环流化床的调试和性能试验、DCS逻辑设计组态、机组试运行、机组保运等。所承担按期圆满完成,质量优良并受到业主方的好评,且有部分工程获得国家奖励。
Xi’an Xingyi Electric Power Commissioning Co., Ltd has commissioned or tested over twenty thermal units till now. 8 of them are large scale thermal units of 600MW, including the desulfurization of the flue gas, the commissioning and characteristic testing of the gas turbine, the coal fired unit, and the circulation fluidized bed combustion boiler, the DCS configuration, the unit trail run and operation insurance/supervision. The company has accomplished all iys tasks in time, in good quality, and met the satisfaction of the owners.
  河北宣化热电公司技术改造工程,2×300MW燃煤发电机组调试;
The 2×300MW coal fired unit commissioning in Hebei Xunahua Thermal Power Co., Ltd’s modification project.

  正在进行的项目On-going projects:
  湛江电力有限公司混煤工程分系统、整套启动调试;
The subsystem commissioning and whole set startup of the mixed coals project of Zhanjiang Electric Power Co., Ltd.
  苏丹喀土穆北电厂2×110MW燃油机组调试,该工程为苏丹目前最大的燃油机组;
The commissioning of the biggest, up tonow, fuel oil power units in Sudan, the second phase of Khartoum North Power Station, 2×110MW.
  新疆华泰二期项目热电站工程机组分系统、整套启动调试;
The subsystem commissioning and whole set startup of Xinjiang Huatai Thermal Power Station, phase II, 2×135MW.
  南京热电2×600MW机组汽机调试、化工园2×300MW机组汽机整套调试;
The commissioning of the turbine in Nanjing Thermal Power Station, 2×600MW, and the turbine whole set startup in Nanjing Chemical Engineering Park, 2×300MW.
  中国石油化工股份有限公司长岭分公司煤代油二期工程循环流化床调试服务;
The circulation fluidized bed combustion boiler commissioning service to Changling branch of China Petroleum and Chemical Corporation, in phase II coal-replace-oil project.
  陕西渭河洁能有限公司三期脱盐水站调试;
The commissioning of the phase III demi plant of Weihe Jieneng Co., Ltd, Shaanxi.
  洛阳万基发电有限公司热电联产技改项目5号机调试,2×330MW;
The commissioning of the 5th unit in Luoyang Wanji Power Generation Co., Ltd, which is a CHP technical modification project, 2×330MW.
  重钢环保搬迁工程2号机组、130吨燃气锅炉及周边外围施工范围内的电气及热控分系统调试及整套启动工程;
The electric and I&C subsystem commissioning and whole set startup after moved the 2nd unit, the 130 ton gas boiler, and the equipments surrounded.
  陕西华电蒲城发电有限责任公司4×300MW、2×600MW AGC、一次调频、协调系统及子系统完善工作;
The 4×300MW、2×600MW commissioning of the AGC, the primary frequency modulation, coordinating system, and various subsystems in Huadian Pucheng Power Co,. Ltd, Shaanxi.

 