  Power Station Technology Engineering Co., Ltd.
 
 
Exported projects
Fire prevention , HVAC (heating,ventilation and air-condition) and CCTV system
DCS
PLC system
Instrument integration and panel cabinet
clean energy sources and coal chemical industry
Instrument integration and panel cabinet

Customer name

Project description

Scope of contract

Date

Shuanghuai Power Plant Phase I of Chongqing Hechuan Power Co., Ltd.

2×300MW Set

Instrument integration

2006

Jiahua Cement Building Materials Co., Ltd. of Kunming Iron & Steel Group

4000t/d

Low-voltage control cabinet

2005

Shanxi Baode Waste Rock Plant

2×135MW Set

Instrument panel, console and cabinet

2005

Luneng Shandong Canal Power Plant

2×300MW Set

Thermal instrument integration and distribution cabinet

2005

Huaneng Wuhan Yangluo Power Plant

2×600MW Set

Instrument panel, console and cabinet

2005

Lunan Yunnan Diandong Energy Source Co., Ltd.

4×600MW Set

Thermal control integration

2005

Guangdong Chaozhou Power Plant

2×600MW Set

Instrument panel, console and cabinet

2005

Shandong Zhongtai Power Co., Ltd.

4×150MW Set

Thermal instrument small integration

2005

Northwest Power Engineering Contracting Company Shenhua Sunshine Power Plant

2×135MW Set

frequency converter cabinet

2005

Datang International Gaojing Thermal Power Plant

2×300MW Set

panel, console and cabinet

2005

Qinghai Huadian Datong Power Plant

2×300MW Set

panel and cabinet, thermal electric Instrument integration

2005

Hebi Wanhe Power Plant

2×300MW Set

Heating/protection box

2004

The Second Power Plant of Huxian County

2×300MW Set

Heating/protection box

2004

Shandong Zhongtai Power Co., Ltd.

4×150MW Set

Heating/protection box and terminal box

2004

Gansu Liancheng Power Plant

2×300MW Set

Thermal instrument small integration

2004

Newly-built Project of Luneng Hequ Power Plant

2×600MW Set

Thermal instrument integration, Withdrawable distribution box, instrument panel and cabinet

2004

Self-Provided Power Plant of India BALCO Aluminum Factory

4×135MW Set

Thermal instrument integration,distribution cabinet and power supply cabinet

2004

Hubei Huangshi Power Plant
“big replaced with small” technical reconstruction engineering

2×330MW Set

Thermal instrument integration, instrument panel and cabinet

2003

Hebei Guohua Dingzhou Power Plant Phase I

2×600MW Set

Integrated heating/protection box
(including transmitter, instrument valve and matched pipes etc.)

2003

Luneng Shanxi Hequ Power Plant

2×600MW Set

Thermal instrument integration, instrument panel and cabinet, MCC CABINET

2003

Guotou Beibuwan Power Co., Ltd.

2×300MW Set

Thermal instrument integration

2003

The Second Power Plant of Tatang Hancheng

2×600MW Set

General contracting of boiler island, turbine island (MCC cabinet,Heating/protection box and Instrument integration)

2003

Pengcheng Power Plant Phase II of Xuzhou Huarun Power Co., Ltd.

2×300MW Set

Withdrawable distribution box, instrument panel and cabinet, protection/heating box etc.

2003

Shanxi Datang Pingwang Thermal Power Co., Ltd.

2×200MW Set

BTG PANEL AND Instrument integration

2003

Malaysia Gujin Power Plant

2×55MW Set

BTG case and mosaic panel,MCC cabinet,Heating/protection box and instrument integration

2003

Shandong Power Engineering Consultation Institute, Gansu Jiuquan Iron & Steel (Group) Co., Ltd.

2×125MW Set
(CFB BOILER)

Thermal control equipment integration, instrument panel and cabinet

2002

Shandong Zhonghe Thermal Power Co., Ltd.

2×50MW Set
(CFB BOILER)

Thermal control equipment integration, instrument panel and cabinet

2001

Qinghai Qiaotou Power Plant

1×125MW Set

BTG PANEL AND Thermal control integration equipment

2001

Matou Power Plant

2×200MW Set

reconstruction of panel, console, case and cabinet

2001

Hebei Power School

200MW Set simulation

Thermal control BTG PANEL console and Instrument integration

2001

self-provided power plant of Shaanxi Tongchuan Aluminum Factory

2×50MW Set

Thermal control equipment integration, instrument panel and cabinet

2001

Gansu Qilianshan Cement Co., Ltd.

200,000 tons cement production line

Thermal control equipment integration, instrument panel and cabinet

2001

Huainan Luohe Power Plant

300MW Set boiler reconstruction

Mosaic BTG panel and Instrument integration

2001

self-provided power plant of Guizhou Aluminum Factory

2×50MW Set

Thermal control equipment integration, instrument panel and cabinet

2001

Sichuan Yibin Siliya Group Company

PPV engineering

General contracting of panel console of control room, instrument control equipments

2000

Hebei Zhangjiakou Power Plant Phase IV

2×300MW Set

BTG PANEL AND Instrument integration

2000

Heilongjiang Qitaihe Power Plant

2×350MW Set

BTG PANEL AND Instrument integration

2000

Bangladesh Oriental Refinery Plant

3MW Set

general contracting of thermal control (design, goods supply, installation instruction, commissioning)

2000

Hubei Qingshan Power Plant

200MW oil-to-coal Set

BTG PANEL, CASE, CABINET AND Instrument integration

2000

Hebei Qinhuangdao Power Plant

200MW Set

BTG PANEL

2000

Douhe Power Plant

5# Set DCS reconstruction

Thermal control equipment integration, instrument panel and cabinet

2000

The Second Power Plant of Anhui Hefei

2×350MW Set

general contracting of thermal control (design, goods supply, installation instruction, commissioning) of Boiler island and sootblowing, ash- slag disposal, coal convey PLC(parts of)panel, case, cabinet and thermal control equipment and materials integration

1999

Bangladesh Jida Port Power Plant

200MW Set

Instrument integration

1999

Tianjin Panshan Thermal Power Plant

2×500MW Set

BTG PANEL AND Instrument integration

1999

Gansu Wuwei Thermal Power Plant

2×25MW Set

DAS AND THERMAL CONTROL PANEL Instrument integration

1998

Qinghai Qiaotou Power Plant

2×125MW Set

BTG PANEL AND Thermal control integration

1998

Shanxi Wuyang Power Plant

2×50MW Set

Panel console and thermal control instrument integration

1998

Ningxia Yinchuan Thermal Power Plant

2×25MW Set

Thermal control integration

1998

Shiquan hydraulic power plant

hydraulic power Set

electromechanical equipments integration

1998

Jiangsu Wujin power plant

50MW Set

Thermal control panel and Instrument integration

1998

Hebei Shalingzi power plant Phase I

2×300MW Set reconstruction

BTG PANEL, DCS CONSOLE

1998

Pakistan Jiamuxiaoluo Power Plant

200MW coal-burning Set

instrument integration and faults elimination

1998

Shanxi Linyi Chemical General Factory

60000 tons synthetic ammonia

Thermal control panel of central control room and instrument integration

1998

Shaaxi Fuguo Power Plant

2×25MW Set

Panel console and thermal control instrument integration

1997

Sichuan Aixi self-provided power plant

2×50MW Set

Panel console and thermal control instrument integration

1997

Shaanxi Lueyang Power Plant

2×50MW Set reconstruction

Instrument integration

1997

Shaanxi Pucheng Power Plant

300MW Set imported from Roumania

parts of thermal control instrument reconstruction

1997

Shenmudian Tower Power Plant

2×25MW Set

Panel console and instrument integration

1997

The Second Power Plant of Shaaxi

4×300MW Set

Panel console and instrument integration

1997

Jiangsu Sheyanggang Power Plant

2×125MW Set

Instrument integration

1996

Shaaxi Xianyang Color Display Tube Plant

mask cleaning production line

Electric, instrument control panel

1997

Pakistan Wuqi Power Plant

560MW
combined cycle Set

Panel console cabinet case and thermal control instrument integration

1997

 