Exported projects
Fire prevention , HVAC (heating,ventilation and air-condition) and CCTV system
DCS
PLC system
Instrument integration and panel cabinet
clean energy sources and coal chemical industry
DCS

Customer name

Project description

Scope of contract

Date

Henan Huarun Power Gucheng Power Plant

2×300MW Set

desulfurization DCS

2005

Huarun Guangxi Fangchenggang Power Plant

2×600MW Set

Power house DCS

2005

Luneng Yuannan Diandong Power Plant

4×600MW Set

desulfurization DCS

2005

Luneng Wangqu Power Plant

2×600MW Set

desulfurization DCS

2005

Iran Tawazi Power Plant

2×60MW Set

Power house DCS

2005

Guodian Zhuhai Power Plant

2×700MW Set

desulfurization DCS

2005

Hebei Xingtai Guotai Power Generation Co., Ltd.

2×300MW Set

Power house DCS(including desulfurization)

2004

Huadian Tianjin Dagang Power Plant

2×328MW Set

DCS reconstruction

2004

Zhejiang Wenzhou Power Plant

2×300MW Set

desulfurization DCS

2004

Liaoning Wushun Petrochemical Company

4 boilers and two machines

Power house DCS

2004

Guangdong Shajiao C Power Plant

3×600MW Set

DCS reconstruction

2004

Malaysia Gujin Power Plant (Phase II)

2X50MW

general contracting of thermal control technology (including DCS control plan)

2003

The Second Power Plant of Tatang Hancheng
The Second Power Plant of Datang Hancheng

2×600MW Set

I&C island(DCS, CIS, MIS, electric protection system, TV monitoring system etc.)

2003

Burma TIGYIT Coal Burning Power Plant

2×60MW Set

General contracting of thermal engineering(including DCS, PLC system, thermal control equipment integration, instrument panel and cabinet and thermal installation materials)

2002

Lanzhou Chemical Industry Company

polypropylene systemization

DCS,console and instrument integration

2002

Sudan Jili Power Station

two sets of 2+2+1 United cycle power station (200MW)

DCS, general contract of thermal control and installation and commissioning

2001

Xinxiang Bailu Chemical Fiber Group Company

reconstruction

DCS

1999

The Second Power Plant of Anhui Hefei

2×350MW Set

General contracting of boiler island thermal control equipments(design, goods supply, installation instruction, commissioning and DCS control plan)sootblowing, ash- slag disposal, coal convey PLC(parts of)panel, case, cabinet and thermal control equipment and materials integration

1999

Guangdong Shaoguan Power Plant

2×200MW Set

DCS reconstruction

1996

Vietnam Xiefu Power Plant

3×125Mw oil-burning Set

general contract of thermal control (design, goods supply, commissioning and installation instruction) DCS, chemical water PLC, BTG panel console and thermal control instrument integration

1996

Guangzhou Yuancun Power Plant

3×220T/ H + 2×50MW
coal-burning Set

DCS

1995

 