Customer name |
Project description |
Scope of contract |
Date |
Henan Huarun Power Gucheng Power Plant |
2×300MW Set |
desulfurization DCS |
2005 |
Huarun Guangxi Fangchenggang Power Plant |
2×600MW Set |
Power house DCS |
2005 |
Luneng Yuannan Diandong Power Plant |
4×600MW Set |
desulfurization DCS |
2005 |
Luneng Wangqu Power Plant |
2×600MW Set |
desulfurization DCS |
2005 |
Iran Tawazi Power Plant |
2×60MW Set |
Power house DCS |
2005 |
Guodian Zhuhai Power Plant |
2×700MW Set |
desulfurization DCS |
2005 |
Hebei Xingtai Guotai Power Generation Co., Ltd. |
2×300MW Set |
Power house DCS(including desulfurization) |
2004 |
Huadian Tianjin Dagang Power Plant |
2×328MW Set |
DCS reconstruction |
2004 |
Zhejiang Wenzhou Power Plant |
2×300MW Set |
desulfurization DCS |
2004 |
Liaoning Wushun Petrochemical Company |
4 boilers and two machines |
Power house DCS |
2004 |
Guangdong Shajiao C Power Plant |
3×600MW Set |
DCS reconstruction |
2004 |
Malaysia Gujin Power Plant (Phase II) |
2X50MW |
general contracting of thermal control technology (including DCS control plan) |
2003 |
The Second Power Plant of Tatang Hancheng
The Second Power Plant of Datang Hancheng |
2×600MW Set |
I&C island(DCS, CIS, MIS, electric protection system, TV monitoring system etc.) |
2003 |
Burma TIGYIT Coal Burning Power Plant |
2×60MW Set |
General contracting of thermal engineering(including DCS, PLC system, thermal control equipment integration, instrument panel and cabinet and thermal installation materials) |
2002 |
Lanzhou Chemical Industry Company |
polypropylene systemization |
DCS,console and instrument integration |
2002 |
Sudan Jili Power Station |
two sets of 2+2+1 United cycle power station (200MW) |
DCS, general contract of thermal control and installation and commissioning |
2001 |
Xinxiang Bailu Chemical Fiber Group Company |
reconstruction |
DCS |
1999 |
The Second Power Plant of Anhui Hefei |
2×350MW Set |
General contracting of boiler island thermal control equipments(design, goods supply, installation instruction, commissioning and DCS control plan)sootblowing, ash- slag disposal, coal convey PLC(parts of)panel, case, cabinet and thermal control equipment and materials integration |
1999 |
Guangdong Shaoguan Power Plant |
2×200MW Set |
DCS reconstruction |
1996 |
Vietnam Xiefu Power Plant |
3×125Mw oil-burning Set |
general contract of thermal control (design, goods supply, commissioning and installation instruction) DCS, chemical water PLC, BTG panel console and thermal control instrument integration |
1996 |
Guangzhou Yuancun Power Plant |
3×220T/ H + 2×50MW
coal-burning Set |
DCS |
1995 |